欢迎来到中国电源学会电子资源平台
会员 Reconfiguration of NPC Multilevel Inverters to Mitigate Short Circuit Faults Using Back-to-Back Switches
  • 10
  • 0
  • 0
  • 0
  • 2018/01/01
摘要
The main focus of this paper is to propose a reconfiguration method to mitigate short circuit faults in a neutral point clamped multilevel inverter which is widely used as a power conversion system with distributed energy resources. Existing reconfiguration methods use either a redundant strategy or need a large number of additional devices pre-installed in the circuit; these will increase the bulk and complexity of the system. Most existing control-strategy-based methods distort the phase-to-neutral voltage, which results in degradation of power quality. To maintain control-strategy-based reconfiguration, avoid significant change to the circuit topology, and avoid phase voltage distortion, a new and practical reconfiguration method is proposed in this paper. The proposed method is applicable to neural point clamped (NPC) multilevel inverters at any voltage level and can mitigate short circuit faults in any device. A technique of switching series connected switches is selected to combine with the proposed re-configuration method since it’s a practical design consideration for realistic implementation. MATLAB/Simulink is used to simulate a five-level NPC inverter with non-idealities to verify the proposed reconfiguration method. A five-level NPC is also built and tested to experimentally verify the proposed method. Short circuit faults are injected to different devices and the proposed method is verified to quickly and effectively recover the NPC inverter from these faulty conditions.
  • 若对本资源有异议或需修改,请通过“提交意见”功能联系我们,平台将及时处理!
来源
关键词
相关推荐
可试看前3页,请 登录 后进行更多操作
试看已结束,会员免费看完整版,请 登录会员账户 或申请成为中国电源学会会员.
关闭
温馨提示
确认退出登录吗?
温馨提示
温馨提示
温馨提示
确定点赞该资源吗?
温馨提示
确定取消该资源点赞吗?
温馨提示
确定收藏该资源吗?
温馨提示
确定取消该资源收藏吗?
温馨提示
确定加入购物车吗?
温馨提示
确定加入购物车吗?
温馨提示
确定移出购物车吗?